Patio Town source of retaining walls, pavers and rock Home | Product Catalog | Delivery Options | Locations      
Patio Town Top displayPatio Town 100s of ideas for your yard
Patio Town OutdoorPatio Town Outdoor DisplaysSince 1965 - Patio Town -  100s of ideas for your yardMore than Two Acres of Beautiful Outdoor displays!Right corner of Patio Town
100s of ideas for your yard landscaping products supplies, retaining walls, rock and pavers
               
3 locations store

About Patio Town
Products
Patio Town University
Free Seminars
Install - Standard, Cobble, Accent
Install - Mosette
Install - Mosaic
Install - Willow Creek Pavers
Install - Handy-Edge
Install - Handy-Stone, Handy-Wall
Gallery
Customer Service
Left Bottom page














         
      
    


 ‹  6 of 7  

Installation Steps for VERSA-LOK Standard, Cobble and Accent

Step 5 Install soil reinforcement (if necessary)

Versa-Grid or comparable geogrid soil reinforcement may be required on walls in which the weight of the wall alone is not enough to resist anticipated soil pressures.

For most walls less than 4 feet tall that have no additional loading behind them, soil reinforcement is not necessary. For walls taller than 4 feet, or walls supporting additional loading, you should consult with your local building officials and a licensed professional civil engineer, if required, to determine whether soil reinforcement will be needed. This is important, because improperly engineered walls, or walls with insufficient soil reinforcement, could fail.

Check your geogrid manufacturers’ instructions for installation specifications. The type, length and spacing of the geogrid will vary for each project and should be specified in a final wall design prepared by a licensed engineer.

Lay the geogrid on top of the units starting about 1 inch behind the front face of the wall. Roll it out behind the wall and over the compacted drainage aggregate and backfill. Cut to the length specified in your construction drawings.    

Position additional pieces of geogrid adjacent to one another without overlapping. Then, place the next course of units on top of the geogrid. Insert pins to secure the geogrid between the two courses. Remove the slack by pulling the geogrid away from the wall face and anchoring the back ends with stakes in each corner.   

When all the geogrid sections are in place and staked tight, place drainage aggregate and backfill and compact both.   