Installation Steps for VERSA-LOK Standard, Cobble and Accent
The two pins should engage two separate units in the lower course. Make
sure the pins are fully seated in the lower unit slots. Use your mallet
and an extra pin to seat the installed pins about 1 inch below the top
of the upper units.
After pinning, pull the units forward to tighten the pin connections.
Then, check the alignment and level.
Step 4 Ensure Proper Drainage and Backfill
Proper drainage is critical to the performance of any retaining wall
system. Drainage aggregate is used behind all walls to keep water
pressure from building up behind the wall face. In addition, for walls
over 3 feet high, perforated drain pipe is used to collect and eliminate
large amounts of water from behind the wall.
Lay the drain pipe on a 1- to 2-inch layer of drainage aggregate
directly behind the above-grade course. Next, place more drainage
aggregate-- typically 3/4-inch clear, free-draining, angular gravel--on
top of the drain pipe and to a depth of 12 inches behind the wall.
Place soil backfill directly behind the drainage aggregate and then
compact both. Proper placement and compaction of backfill is critical to
the stability of a segmental retaining wall.
Make sure you compact no more than 6 inches of backfill and aggregate at
a time when using a power compactor, and no more than 2 inches at a time
when hand compacting.
Additional courses are placed, pinned and backfilled in the same
fashion. As you go along, remember to keep checking your bond, alignment
and level.
|