Patio Town source of retaining walls, pavers and rock Home | Product Catalog | Delivery Options | Locations      
Patio Town Top displayPatio Town 100s of ideas for your yard
Patio Town OutdoorPatio Town Outdoor DisplaysSince 1965 - Patio Town -  100s of ideas for your yardMore than Two Acres of Beautiful Outdoor displays!Right corner of Patio Town
100s of ideas for your yard landscaping products supplies, retaining walls, rock and pavers
               
3 locations store

About Patio Town
Products
Patio Town University
Free Seminars
Install - Standard, Cobble, Accent
Install - Mosette
Install - Mosaic
Install - Willow Creek Pavers
Install - Handy-Edge
Install - Handy-Stone, Handy-Wall
Gallery
Customer Service
Left Bottom page














         
      
    


 ‹  5 of 7    ››

Installation Steps for VERSA-LOK Standard, Cobble and Accent

The two pins should engage two separate units in the lower course. Make sure the pins are fully seated in the lower unit slots. Use your mallet and an extra pin to seat the installed pins about 1 inch below the top of the upper units.

After pinning, pull the units forward to tighten the pin connections. Then, check the alignment and level.    

Step 4 Ensure Proper Drainage and Backfill

Proper drainage is critical to the performance of any retaining wall system. Drainage aggregate is used behind all walls to keep water pressure from building up behind the wall face. In addition, for walls over 3 feet high, perforated drain pipe is used to collect and eliminate large amounts of water from behind the wall.

Lay the drain pipe on a 1- to 2-inch layer of drainage aggregate directly behind the above-grade course. Next, place more drainage aggregate-- typically 3/4-inch clear, free-draining, angular gravel--on top of the drain pipe and to a depth of 12 inches behind the wall.    

Place soil backfill directly behind the drainage aggregate and then compact both. Proper placement and compaction of backfill is critical to the stability of a segmental retaining wall.    

Make sure you compact no more than 6 inches of backfill and aggregate at a time when using a power compactor, and no more than 2 inches at a time when hand compacting.

Additional courses are placed, pinned and backfilled in the same fashion. As you go along, remember to keep checking your bond, alignment and level.

    Click on to view image Next Patio Town step
Patio Town Ad as seen on TV100s of Ideas for Your Yard
          Email Patio Town for landscaping products supplies, retaining walls, rock and pavers info@patiotown.com  | site map      Copyright © 2007 Patio Town